Hydraulic tube bender consists of the following components: hydraulic pipe pushing part, bending radius angle adjustment device, hydraulic pump, intermediate frequency power supply cabinet, general control table, generator control cabinet, capacitor cabinets, water cable, Reactor etc. Customers should buy induction coils, steel pipe clamps according to the different size.
Put the raw material pipe on the pipe bending machine with a clamping roller clamp, put induction heating coil in front of the raw steel, steel front using steel plate clamp, and fixed on the bend radius arm. Activate the cooling water pump, start medium frequency power, make the raw material tube local heating, start bending machine hydraulic system, then the raw material tube can slowly moving forward, it starts bending. Hei Yan also manufacture pipe expanding machine,elbow forming machine,hydraulic press,tee machine,hot induction heating equipment
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com
Noticement on machine parts: 1. Idler wheel needs to be injected butter one time for each 5 days 2. Entrust wheel under front idler wheel case shall be inject butter one time for each 24 hours since it is near by heating coils. 3. Shift arm spindle shall be injected butter one time per year, running gear on rail, pipe wheel leading gear shall be injected oil one time for each 2 years since less speed of roll attrition. 4. Please clean up the seat of shift arm and inject butter to keep wet when adjusting bending radius, 5. Each active parts on flameout transformer and screwed poles shall be injected butter one time for each two days 6. Please check fastners of main machine each month and ensure that they are in a tighten situation all the way 7. Please return oil vat's piston pole to terminal to refuse hitting on piston pole if equipment is not use. 8. Please give a empty trial running after a long stop of equipment ,ensure that it is in a right working situation