|
|
Beveling machine |
|
Type:HYP series |
Specification:60mm-1420mm |
Application:process carbon steel,stainless steel, heat-resistant alloy steel, |
Delivery:30-60days |
|
|
|
|
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
|
Beveling machine
Product Overview of Beveling machine
1. Fixed beveling machine is used to bevel straight tube, bend, elbow, tee's end.
2. This machine adopts the standard power to change, with strong cutting ability, simple process, easy operation, low cost, hydraulic clamping, when the pipe wall thickness is less than 12mm ,human hand can be used to move the host shape forming knife.
3. The machine with roller bracket , the tube can be adjusted up and down to meet various specifications steel center with machine center line groove, the upper and lower roller bracket on artificial lift
4. This Beveling machine is safe, reliable and convenient, it's the ideal pipe end beveling processing equipment.
Hei Yan also manufacture pipe expanding machine,pipe bending machine,hydraulic press,tee machine,hot induction heating equipment.
|
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
|
Model |
Beveling range
(mm) |
Thickness
(mm) |
HYP-16 |
16-30 |
1.5-15 |
HYP-28 |
28-80 |
1.5-15 |
HYP-65 |
65-159 |
3-20 |
HYP-80 |
80-273 |
4-20 |
HYP-80-1 |
80-273 |
15-75 |
HYP-150 |
150-351 |
4-20 |
HYP-150-1 |
150-351 |
15-75 |
HYP-300 |
300-630 |
4-20 |
HYP-300-1 |
300-630 |
15-75 | |
|
|
|
Notes: 1 The bevel machine should place flat,stable fixation,to avoid moving when using.when the power supply connect well, please pay attention to check the operation direction and transmission parts.
2 Let the bevel machine clamp the pipe,prevent the collision of tools,the pipe end and the feedings should be left between the 2-3mm gap,to prevent excessive feed first time,turn on the malecoupling when working,to avoid the second feed at the same time.
3 After the feed,should remain in situ rotate a few times,so that smooth the bevel, move the knife frame after operation, which away from the cutting surface,and then remove the pipe.
4 Cooling system must be kept clean to prevent the impurities,iron filings into the oilway,blocking the nozzle.
5 After finished the work,need do maintenance work | |
|
|
|
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
Related Products |
|
|
|
|
|