|
|
Chamfering machine |
|
Type:HYP series Pipe chamfering Machine |
Specification:thickness 1.5-150mm |
Application:process carbon steel,stainless steel, heat-resistant alloy steel, |
Delivery:45days |
|
|
|
|
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
|
Chamfering machine: Chamfering machine is a part of the metal processing field.
It is composed of permanent seat, sliding seat, delivery mechanism, centring mechanism ,pneumatic clamp mechanism, screw rod transmission mechanism, tool apron mechanism and so on.
Pipechamfering machine Can not only process the U, V welding line of end sloping, back ridging, edge cutting for carbon steel, stainless steel and alloyed steel pipes, but also can treat the welded convex flange and plain flange. The processing angle is chosen wantonly, the knife and can leave automatically, small, rigidity is strong, it is simple and convenient to operate.
If you are interested in our chamfering machine, don't hesitate to contact us. Hei Yan also supply elbow forming machine,pipe bending machine,pipe expanding machine,cold draw tee machine,hydraulic press,medium frequency power supply,moulds and so on. |
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
|
Model |
Beveling range
(mm) |
Thickness
(mm) |
HYP-16 |
16-30 |
1.5-15 |
HYP-28 |
28-80 |
1.5-15 |
HYP-65 |
65-159 |
3-20 |
HYP-80 |
80-273 |
4-20 |
HYP-80-1 |
80-273 |
15-75 |
HYP-150 |
150-351 |
4-20 |
HYP-150-1 |
150-351 |
15-75 |
HYP-300 |
300-630 |
4-20 |
HYP-300-1 |
300-630 |
15-75 | |
|
|
|
Notes: 1 The bevel machine should place flat,stable fixation,to avoid moving when using.when the power supply connect well, please pay attention to check the operation direction and transmission parts.
2 Let the bevel machine clamp the pipe,prevent the collision of tools,the pipe end and the feedings should be left between the 2-3mm gap,to prevent excessive feed first time,turn on the malecoupling when working,to avoid the second feed at the same time.
3 After the feed,should remain in situ rotate a few times,so that smooth the bevel, move the knife frame after operation, which away from the cutting surface,and then remove the pipe.
4 Cooling system must be kept clean to prevent the impurities,iron filings into the oilway,blocking the nozzle.
5 After finished the work,need do maintenance work |
|
|
|
|
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com |
|
|
Related Products |
|
|
|
|
|