Hydraulic elbow makercan be classfied into one step pushing:pushing elbow,two step pushing,three step pushing :expanding machine. The standard stroke will be 10.5 to 12.5 meters,also can act according to customer requirement,to add the stroke.
Hydraulic elbow makeradopts winding engine to motivate steel wire rope ,sending the pipe into the equipment,automatic.
The head position and the bed part of the elbow machine is made of solid material. And after annealing it can eliminate internal stress. In total, there is enough strength and rigidity to prevent permanent deformation.
Driven by a double-cylinder ,when the arm is near the settleed point of bending,the hydraulic system will buffer automatically,improving the precision of reset and the work efficiency.
Hei Yan Group invent hydraulci elbow maker,to improve efficiency as well as protect our enviroment. Welcome to visit our factory to negotitate the hydraulic elbow maker
Your Demand,Our Liability TEL:0086-13931764957 E-mail:ceo@xnmac.com
A Check the fastener of every part to keep it in solid state. B Check if every joint of hydraulic pump station is installed with oil proof rubber seal ring, if any damage with it or oil leak, please change it as soon as possible. C If the forward or backward is not workable, first check if the magnetic valve works, if it operates well, check the sequence valve 6X3?¡éoverflow valve YF-L20H4 or whether one way unload valve 4HD3 is cut by impurities. (It is likely to happen when the machine begins to use). If it is cut, take it down, and wash it by gasonline or diesel, reload it. D Within 1-2 month after using, please wash the oil container and filtrate the hydraulic oil for once F When wahing the oil container, please wash the fuel inlet filter of every pump station.
The actual stroke should be less than the Max stroke,which means it will be 30~50mm space left for front and rear,to avoid the cylinder strike the cylidner flange,result damage to the equipment. The equipment should be installed according to the foundation drawing the manufacturer offered,the equipment shoud be placed flat.Before shipment, the eqipment will be tested to fine condition.After water and electricity Ok,manufacturer will install and debug.