This equipment mainly consists of the following parts: the elbow making pushing machine, hydraulic pump, operate panel, control panel of generators, intermediate frequency power supply, compensation capacitor, water cable, intermediate frequency coil adjustment frame, the reactor.
The elbow machine can produce OD25mm-1420mm,wall thickness 5mm-120mm,angle 22.5,45,90,135 degree and customer required angle.
1 Pump station and moderate frequency power had better install in the workshop vice across-chain inside. 2 Each frequency power supply cooling water should be greater than 50m3 and have dust control measures.
1.Check each part of fasteners, ensure they are fixed. 2.Make sure that all connectors of the hydraulic pump station are equipped with oil seal rings, if the seal rings appear damaged or oil leakage, should be replace timely.
3.If found forward or backward abnormality, first check electro-hydraulic valve whether operate normal, if working normally, then you should check whether the electro-hydraulic relief valve or the one-way unloading valve has contaminant that made it could not working or not(this phenomenon usually happen when you just use this machine). If has contaminant, you should open it, clean by gasoline or diesl oil, everything is ok, then re-install.
4.Operated this equipment within 15 days, you should clean the tank and filter hydraulic oil once.
5.When cleaning tank, you should clean the inside the oil filter of tank also